Publications (13) |
Top | Institute | Publications |
A1 Publications (3) [show] |
- Adriaens, D.; Decleyre, D.; Verraes, W. (1993). Morphology of the pectoral girdle in Pomatoschistus lozanoi De Buen, 1923 (Gobiidae), in relation to pectoral fin adduction. Belg. J. Zool. 123(2): 135-157, more
- Adriaens, D.; Decleyre, D.; Verraes, W. (1993). Morphological adaptations to pectoral fin adduction in Pomatoschistus lozanoi (Gobiidae), in: Chardon, M. et al. Third Belgian Congress of Zoology, 5-6 November 1993. Belgian Journal of Zoology, 123(Suppl. 1): pp. 3-4, more
- Vancoppenolle, B.; Decleyre, D.; Verraes, W. (1993). Functional-morphological study of the upper jaw and its protrusion mechanism in Gobiidae (Teleostei). Belg. J. Zool. 123(Suppl. 1): 75-76, more
|
Books (2) [show] |
- De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., more
- De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: Bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan. Waterwegen en Zeekanaal/Agentschap voor Natuur en Bos: Antwerpen. ISBN 9789040303395. 99 pp., more
|
Book chapters (7) [show] |
- Decleyre, D.; Maris, T.; Van Ryckegem, G. (2013). Natuur, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan. pp. 45-61, more
- Decleyre, D.; Maris, T.; Van Ryckegem, G. (2013). Nature, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 61-85, more
- Decleyre, D.; De Beukelaer-Dossche, M. (2013). Introduction, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 7-8, more
- Decleyre, D.; De Beukelaer-Dossche, M. (2013). Inleiding, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan. pp. 5-6, more
- Van Looveren, R.; Moeskops, S.; Boone, C.; Peeters, P.; Decleyre, D. (2013). Technical design, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 101-109, more
- Van Rompaey, M.; Decleyre, D. (2013). Public support, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 31-43, more
- Van Rompaey, M.; Decleyre, D. (2013). Maatschappelijk draagvlak, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: bouw van een gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij in het kader van het Sigmaplan. pp. 23-31, more
|
Report [show] |
- Schneiders, A.; Spanhove, T.; Breine, J.; Zomlot, Z.; Verbeiren, B.; Batelaan, O.; Decleyre, D. (2014). Natuurrapport - Toestand en trend van ecosystemen en ecosysteemdiensten in Vlaanderen: technisch rapport. Ecosysteemdienst regulering overstromingsrisico. Mededelingen van het Instituut voor Natuur- en Bosonderzoek, 1988582. Instituut voor Natuur- en Bosonderzoek: Brussel. 91 pp., more
|
|