Skip to main content
Publications | Persons | Institutes | Projects
[ report an error in this record ]basket (0): add | show Print this page

Preparation for the construction of a concept of the second container terminal, north of the "Lock of Zandvliet" in the port of Antwerp
Meyvis, L.; Aerts, F.; Thibaut, W.; Bernaers, G. (1996). Preparation for the construction of a concept of the second container terminal, north of the "Lock of Zandvliet" in the port of Antwerp, in: 11th International Harbour Congress, Antwerpen, June 17-21, 1996: proceedings. pp. 237-244
In: (1996). 11th International Harbour Congress, Antwerpen, June 17-21, 1996: proceedings. Koninklijke Vlaamse Ingenieursvereniging (KVIV): Antwerpen. ISBN 90-5204-030-3. 752 pp., more

Available in  Authors 
Document type: Conference paper

Authors  Top 
  • Meyvis, L., more
  • Aerts, F., more
  • Thibaut, W.
  • Bernaers, G.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors