Overslaan en naar de inhoud gaan
Publicaties | Personen | Instituten | Projecten
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

Verbetering morfologisch instrumentarium: subreport 2. Modellentrein DCSMv5–ZUNOv3: validatie modelrun 2014
Maximova, T.; Vanlede, J.; De Maerschalck, B.; van Oyen, T.; Verwaest, T.; Mostaert, F. (2014). Verbetering morfologisch instrumentarium: subreport 2. Modellentrein DCSMv5–ZUNOv3: validatie modelrun 2014. Version 3.0. WL Rapporten, 14_094. Waterbouwkundig Laboratorium: Antwerp. IV, 23 + 38 p. bijl. pp.
Deel van: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , meer

Beschikbaar in  Auteurs 
Documenttype: Projectrapport

Trefwoorden
    Hydraulics and sediment > Hydrodynamics > Current velocities  and patterns
    Hydraulics and sediment > Hydrodynamics > Tides
    Numerical modelling
    Numerical models
    ANE, Schelde-estuarium [Marine Regions]
    Marien/Kust; Zoet water

Project Top | Auteurs 
  • AvdT Verbetering Morfologisch Instrumentarium, meer

Auteurs  Top 
  • Maximova, T., meer
  • Vanlede, J., meer
  • De Maerschalck, B., meer

Abstract
    During last years Flanders Hydraulics Research (FHR) has developed hydrodynamic numerical models (2D) for the simulation of water levels and flow velocities in the Scheldt estuary and Belgian coastal zone. For this purpose a so called ‘model train’ is used where bigger models with a rougher grid resolution produce boundary conditions for smaller and finer models.

    This study describes the set up and validation of the first two models in this ‘model train’: DCSMv5 and ZUNOv3 for the simulated year 2014. The model run 2014 is set up in order to generate the boundary conditions for the morphodynamic models of the Scheldt mouth currently under development by Deltares in collaboration with Flanders Hydraulics Research within the framework of the Agenda for the Future project.


Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs