Skip to main content
Publications | Persons | Institutes | Projects
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [113852]
Kanaal Gent-Terneuzen: rapport 1. Passage autoschepen in Westsluis Terneuzen: deel 2. Vaarbaanplots
Eloot, K.; Laforce, E.; Mostaert, F. (2001). Kanaal Gent-Terneuzen: rapport 1. Passage autoschepen in Westsluis Terneuzen: deel 2. Vaarbaanplots. WL Rapporten, 616_1. Waterbouwkundig Laboratorium: Antwerpen. plots pp.
Part of: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , more

Available in  Authors 
Document type: Project report

Keywords
    Cargo ships
    Forces
    Harbours and waterways > Interaction with structures > Locks > Lock entry / lock exit
    Laboratory research
    Locks (Waterways)
    Manoeuvrability
    Model studies
    Simulation
    Netherlands: Gent - Terneuzen Canal, West Lock
    Brackish water
Author keywords
    Ship locks; Scheepssluizen

Contact details

Proposer: Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Waterwegen en zeekanaal NV; Afdeling Bovenschelde, more


Authors  Top 

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors