one publication added to basket [140462] | Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelrapport 2.29. 13u-meting SiltProfiler 29 september 2008 ingang Deurganckdok
International Marine and Dredging Consultants; WL | Delft Hydraulics; Waterbouwkundig Laboratorium (2009). Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelrapport 2.29. 13u-meting SiltProfiler 29 september 2008 ingang Deurganckdok. Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. IV, 36 + bijl. pp.
| |
Available in | Authors |
|
Document type: Project report
|
Keywords |
Data processing Equipment > Measuring devices In situ measurements Motion > Tidal motion > Tides Report literature > Data reports Sedimentation Surveys Belgium, Zeeschelde, Antwerp Harbour, Deurganck Dock [Marine Regions] Brackish water |
Project | Top | Authors |
- Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing, more
|
Authors | | Top |
- International Marine and Dredging Consultants, more
- WL | Delft Hydraulics, more
- Waterbouwkundig Laboratorium, more
- Vanlede, J., revisor, more
|
|
|
|