Skip to main content
Publications | Persons | Institutes | Projects
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [228871]
Public support
Van Rompaey, M.; Decleyre, D. (2013). Public support, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 31-43
In: De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., more

Available in  Authors 

Authors  Top 
  • Van Rompaey, M., more
  • Decleyre, D., more

Abstract
    In a densely populated area like Flanders, space is a scarce commodity, with many interested parties and stakeholders. In such an environment the projects of the updated Sigma Plan have a tremendous impact. To develop and support the Sigma projects in a rational manner, a process and project structure was drawn up. Such a project structure was also devised and implemented for the Kalkense Meersen Cluster Sigma project.This chapter examines the project structure, the various stakeholders and interests in the Kalkense Meersen Cluster project and dealings with the agriculture target group. Finally, it provides an overview of the various procedural steps gone through.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors