Skip to main content
Publications | Persons | Institutes | Projects
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [53443]
Policy planning in the Oosterschelde estuary
van Westen, C.J.; Colijn, C.J. (1994). Policy planning in the Oosterschelde estuary, in: Nienhuis, P.H. et al. The Oosterschelde Estuary (The Netherlands): A case-study of a changing ecosystem. Developments in Hydrobiology, 97: pp. 563-574. https://dx.doi.org/10.1007/978-94-011-1174-4_41
In: Nienhuis, P.H.; Smaal, A.C. (Ed.) (1994). The Oosterschelde Estuary (The Netherlands): A case-study of a changing ecosystem. Developments in Hydrobiology, 97. Springer Science+Business Media: Dordrecht. ISBN 978-94-010-4512-4; e-ISBN 978-94-011-1174-4. XXIV, 597 pp. https://dx.doi.org/10.1007/978-94-011-1174-4, more
In: Dumont, H.J. (Ed.) Developments in Hydrobiology. Kluwer Academic/Springer: The Hague; London; Boston; Dordrecht. ISSN 0167-8418, more
Related to:
van Westen, C.J.; Colijn, C.J. (1994). Policy planning in the Oosterschelde estuary. Hydrobiologia 282: 563-574. https://dx.doi.org/10.1007/BF00024656, more

Available in  Authors 

Keywords
    Decision making
    Management > Resource management > Water management
    Marine/Coastal; Brackish water

Authors  Top 
  • van Westen, C.J.
  • Colijn, C.J., more

Abstract
    During the execution of the Delta project the awareness of the environmental values of estuaries was growing strongly. This awareness has led to a reconsideration of the original proposal to close off the Oosterschelde, and to an alternative view of the management of the estuarine areas and of the civil engineering structures. Now, the completed storm-surge barrier and two compartmentation dams, together with the reinforced dikes, guarantee a sufficient safety against flooding.After the decision to build a storm-surge barrier it was soon recognized that a coherent plan would be needed for the management and development of the Oosterschelde. A policy plan was accordingly produced in which the broad outlines of the policy were set out regarding the various potential uses of the estuary and the possible means of effecting them. Because of the periodic improvement and adjustment of the policy plan an environmental research programme was set up. Also, environmental research played a significant role in the decision-making processes for the completion of the barrier and the compartmentation dams as well as for the management of the storm-surge barrier. The coping-stone of the Delta Project marks the beginning of a new period in the water management of the Netherlands: the period of integrated water management.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors