Skip to main content
Publications | Persons | Institutes | Projects
[ report an error in this record ]basket (0): add | show Print this page

Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelrapport 2.12. 13-uursmeting Sediview op 11/03/2008 tijdens springtij - Liefkenshoek (transect I)
International Marine and Dredging Consultants (2008). Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing: deelrapport 2.12. 13-uursmeting Sediview op 11/03/2008 tijdens springtij - Liefkenshoek (transect I). Versie 2.0. Waterbouwkundig Laboratorium: Antwerpen. IV, 139 pp.

Available in  Authors 
Document type: Project report

Keywords
    Acquisition > Data acquisition
    Data processing
    Equipment > Measuring devices
    Hydraulics and sediment > Hydrodynamics > Current velocities  and patterns
    Hydraulics and sediment > Hydrodynamics > Density currents
    Hydraulics and sediment > Sediment > Cohesive sediment
    In situ measurements
    In-situ measurements
    Motion > Tidal motion > Tides
    Report literature > Data reports
    Sedimentation
    Surveys
    Topographic features > Channels > Navigational channels
    Belgium, Zeeschelde, Transect I
    Brackish water

Project Top | Authors 
  • Langdurige metingen Deurganckdok: opvolging en analyse aanslibbing, more

Authors  Top 
  • International Marine and Dredging Consultants, more
  • Vanlede, J., revisor, more
  • Plancke, Y., revisor, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors