Skip to main content
Publications | Persons | Institutes | Projects
[ report an error in this record ]basket (0): add | show Print this page

Monitoring
Maris, T.; Peeters, P. (2013). Monitoring, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 121-127
In: De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., more

Available in  Authors 

Authors  Top 

Abstract
    As a flood control area with controlled reduced tide (FCA-CRT), Bergenmeersen is expected to make a significant contribution to natural quality in the Scheldt estuary. Via a sophisticated sluice construction with combined inlets and outlets above each other, a reduced tide is introduced into the polder, while retaining the spring/neap tide variation. The purpose: a functional mud flat and marsh ecosystem. A monitoring programme was developed to examine whether these nature objectives are actually being achieved and to make adjustments where necessary.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors