Skip to main content
Publications | Persons | Institutes | Projects
[ report an error in this record ]basket (0): add | show Print this page

Final report of the Schelde Pilot Study
Marchand, M. (2009). Final report of the Schelde Pilot Study. Deltares: [s.l.]. vi, 16 pp.

Available in  Author 

Author keywords
    risk perception · Flood risk · Flood risk management · Flood risk management · strategy · process · planning · risk perception · Stakeholder involvement

Author  Top 
  • Marchand, M., more

Abstract
    The aim of this report is to document the output of the three workshops and the questionnaire. The results of the Flood risk analysis has been reported in another Floodsite report: De Bruijn et al., 2008. For a complete description of the Schelde pilot study reference is made to Chapter 8 of the FLOODsite book on pilot sites (Schanze, in prep.).

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Author