Welkom op het expertplatform!
Dit platform verschaft informatie en kennis omtrent de WL expertisedomeinen 'hydraulica en sediment', 'havens en waterwegen', 'waterbouwkundige constructies', 'waterbeheer' en 'kustbescherming' - gaande van WL medewerkers met hun expertise, het curriculum van deze instelling, tot publicaties, projecten, data (op termijn) en evenementen waarin het WL betrokken is.
Het WL onderschrijft het belang van "open access" voor de ontsluiting van haar onderzoeksresultaten. Lees er meer over in ons openaccessbeleid.
A methodology for multi-criteria design of multi-use offshore platforms for marine renewable energy harvesting
Zanuttigh, B.; Angelelli, E.; Kortenhaus, A.; Koca, K.; Krontira, Y.; Koundouri, P. (2016). A methodology for multi-criteria design of multi-use offshore platforms for marine renewable energy harvesting. Renew. Energy 85: 1271-1289. https://dx.doi.org/10.1016/j.renene.2015.07.080
In: Renewable Energy. Elsevier: Oxford. ISSN 0960-1481; e-ISSN 1879-0682
| |
Trefwoord |
|
Author keywords |
Offshore platforms; Multi-use; Wave energy; Aquaculture; Wind energy;Multi-criteria methodology |
Auteurs | | Top |
- Zanuttigh, B.
- Angelelli, E.
- Kortenhaus, A.
|
- Koca, K.
- Krontira, Y.
- Koundouri, P.
|
|
Abstract |
Multi-use offshore platforms (MUPs) combining renewable energy from the sea, aquaculture and transportation facilities can be considered as a challenging way to boost blue growth and make renewable energy (especially wave energy) environmentally and socio-economically sustainable. MUPs allow sharing the financial and other market/non-market costs of installation and management, locally using the produced energy for different functionalities and optimizing marine spatial planning. The design of these solutions is a complex interdisciplinary challenge, involving scientists and technical experts with different backgrounds. This paper presents a new methodology for the design of a MUP based on technical, environmental, social and economic criteria. The methodology consists of four steps: a pre-screening phase, to assess the feasibility of different maritime uses at the site; a preliminary design of the alternative schemes based on the identified maritime uses; a ranking phase, where the performance of the MUPs is scored by means of expert judgment of the selected criteria; a preliminary design of the selected MUP selected. An example application of this procedure to a site offshore the Western Sardinia coast, Mediterranean Sea, Italy, is provided. In this site the deployment of a MUP consisting of wave energy converters, offshore wind turbines and aquaculture is specifically investigated. |
IMIS is ontwikkeld en wordt gehost door het VLIZ.