Welkom op het expertplatform!
Dit platform verschaft informatie en kennis omtrent de WL expertisedomeinen 'hydraulica en sediment', 'havens en waterwegen', 'waterbouwkundige constructies', 'waterbeheer' en 'kustbescherming' - gaande van WL medewerkers met hun expertise, het curriculum van deze instelling, tot publicaties, projecten, data (op termijn) en evenementen waarin het WL betrokken is.
Het WL onderschrijft het belang van "open access" voor de ontsluiting van haar onderzoeksresultaten. Lees er meer over in ons openaccessbeleid.
Methodology for the ovalization monitoring of newly built circular train tunnels based on laser scanning: Liefkenshoek Rail Link (Belgium)
Nuttens, T.; Stal, C.; De Backer, H.; Schotte, K.; Van Bogaert, P.; De Wulf, A. (2014). Methodology for the ovalization monitoring of newly built circular train tunnels based on laser scanning: Liefkenshoek Rail Link (Belgium). Automation in Construction 43: 1-9. http://dx.doi.org/10.1016/j.autcon.2014.02.017
In: Automation in Construction. Elsevier. ISSN 0926-5805; e-ISSN 1872-7891
| |
Author keywords |
Tunnel monitoring; Ovalization; 3D laser scanning; Cross-sections |
Auteurs | | Top |
- Nuttens, T.
- Stal, C.
- De Backer, H.
|
- Schotte, K.
- Van Bogaert, P.
- De Wulf, A.
|
|
Abstract |
The ovalization monitoring methodology based on laser scanning, developed during two recent tunneling projects in Belgium, elaborates a clear processing workflow and easily interpretable deliverables with sub-millimeter accuracy. The extensive and systematic monitoring coverage during the first three months after construction of a circular tunnel structure delivers an important contribution to the understanding of the tunnels' behavior between the construction phase and the final stabilized shape. The observed differences of the average radius values generally show a decrease in the first week after ring erection and a stabilization of the tunnel structure during the following weeks. The results of such a systematic monitoring program allow the contractors or engineers involved to validate the theoretical models and to compare with the actual behavior of large diameter shield tunneling in soft soil. This is highly valuable, because very few measurements are available at this early stage of a tunnel construction to evaluate the performance and accuracy of such theoretical models. |
IMIS is ontwikkeld en wordt gehost door het VLIZ.