Dit platform verschaft informatie en kennis omtrent de WL expertisedomeinen 'hydraulica en sediment', 'havens en waterwegen', 'waterbouwkundige constructies', 'waterbeheer' en 'kustbescherming' - gaande van WL medewerkers met hun expertise, het curriculum van deze instelling, tot publicaties, projecten, data (op termijn) en evenementen waarin het WL betrokken is.
Het WL onderschrijft het belang van "open access" voor de ontsluiting van haar onderzoeksresultaten. Lees er meer over in ons openaccessbeleid.
Building a new overlay grid for Europe
Ergun, H.; Beerten, J.; Van Hertem, D. (2012). Building a new overlay grid for Europe, in: 2012 IEEE Power and Energy Society General Meeting. IEEE Power and Energy Society General Meeting PESGM, : pp. 8. https://dx.doi.org/10.1109/PESGM.2012.6344805
In: (2012). 2012 IEEE Power and Energy Society General Meeting. IEEE Power and Energy Society General Meeting PESGM. IEEE: [s.l.]. ISBN 978-1-4673-2729-9.
In: IEEE Power and Energy Society General Meeting PESGM. IEEE: New York. ISSN 1944-9925
| |
Beschikbaar in | Auteurs |
|
Documenttype: Congresbijdrage
|
Author keywords |
VSC HVDC; DC Grid; Integrated approach; Transmission system investments;supergrid |
Auteurs | | Top |
- Ergun, H.
- Beerten, J.
- Van Hertem, D.
|
|
|
Abstract |
The strong growth and the expected further increase in renewable energy generation in Europe requires a fundamental upgrade of the transmission system. A potential option is to realize these upgrades at a higher voltage by constructing a new overlay grid or supergrid. Such a supergrid is likely to be built using VSC HVDC technology, especially when considering that a significant part will be offshore. The paper will first discuss how such a grid should be conceived. Aspects that will be covered are the potential topology of such a grid and the balance between mesh size and the connection to the AC system. It will be discussed how such a new overlay grid with multiple controllers interacts with the existing system. The second aspect that will be covered is the stepwise development of such a system. A new overlay grid will not be conceived in a single phase, but link by link. The differences between "green field" and "brown field" approach are highlighted and shown using an example. |
IMIS is ontwikkeld en wordt gehost door het VLIZ.