Overslaan en naar de inhoud gaan
Publicaties | Personen | Instituten | Projecten
[ meld een fout in dit record ]mandje (1): toevoegen | toon Print deze pagina

one publication added to basket [305719]
Design features of the upcoming coastal and ocean basin in Ostend, Belgium
Troch, P.; Stratigaki, V.; Devriese, P.; Kortenhaus, A.; De Maeyer, J.; Monbaliu, J.; Toorman, E.; Rauwoens, P.; Vanneste, D.; Suzuki, T.; Verwaest, T. (2018). Design features of the upcoming coastal and ocean basin in Ostend, Belgium, in: Lynett, P. (Ed.) Proceedings of 36th Conference on Coastal Engineering (ICCE2018), Baltimore, Maryland, July 30 - August 3, 2018. Coastal Engineering Proceedings, 36: pp. [1-10]. https://dx.doi.org/10.9753/icce.v36.papers.94
In: Lynett, P. (Ed.) (2018). Proceedings of 36th Conference on Coastal Engineering (ICCE2018), Baltimore, Maryland, July 30 - August 3, 2018. Coastal Engineering Proceedings, 36. ASCE: Reston. ISBN 978-0-9896611-4-0. , meer
In: Coastal Engineering Proceedings. American Society of Civil Engineers (ASCE): New York. ISSN 2156-1028, meer

Beschikbaar in  Auteurs 
Documenttype: Congresbijdrage

Author keywords
    Coastal and Ocean Basin (COB); Wave and current generation technique; Marine and offshore energy basin; Wave and tidal energy; Wave current-interaction

Auteurs  Top 

Abstract
    The new Coastal and Ocean Basin (COB) located at the Greenbridge Science Park in Ostend, Belgium is under construction since February 2017. The laboratory will provide a versatile facility that will make a wide range of physical modelling studies possible, including the ability to generate waves in combination with currents and wind at a wide range of model scales. The facility is serving the needs in Flanders, Belgium, in the fields of mainly offshore renewable energy and coastal engineering. The COB will allow users to conduct tests for coastal and offshore engineering research and commercial projects. The basin will have state-of-the-art generating and absorbing wavemakers, a current generation system, and a wind generator. It will be possible to generate waves and currents in the same, opposite and oblique directions. The basin is expected to be operational in 2019. This paper presents an overview of the basin’s capabilities, the ongoing work, and selected results from the design of the COB.

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs