Overslaan en naar de inhoud gaan
Publicaties | Personen | Instituten | Projecten
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

Seabirds & offshore wind farms: Monitoring results 2009
Vanermen, N.; Stienen, E.W.M.; Onkelinx, T.; Courtens, W.; Van de walle, M.; Verstraete, H. (2010). Seabirds & offshore wind farms: Monitoring results 2009. Rapporten van het Instituut voor Natuur- en Bosonderzoek, R.2010(12). INBO: Brussel. 37 pp.
Deel van: Rapporten van het Instituut voor Natuur- en Bosonderzoek. Instituut voor Natuur- en Bosonderzoek: Brussel. ISSN 1782-9054, meer

Beschikbaar in  Auteurs 

Trefwoorden
    Aquatic organisms > Marine organisms > Aquatic birds > Marine birds
    Impacts
    Monitoring
    Motors > Turbines
    ANE, Belgium, Hinder Banks, Bligh Bank [Marine Regions]; ANE, Belgium, Zeeland Banks, Thornton Bank [Marine Regions]
    Marien/Kust

Auteurs  Top 
  • Vanermen, N., meer
  • Stienen, E.W.M., meer
  • Onkelinx, T., meer
  • Courtens, W., meer
  • Van de walle, M., meer
  • Verstraete, H., meer

Abstract
    In 2009, we refined the statistical set-up for the assessment of displacement effects on seabirds by wind farms in the Belgian part of the North Sea, more precisely at the Thorntonbank and Bligh Bank. The observed seabird densities were modelled through quasilikelihood estimation. The resulting models allowed to test for the difference in seabird occurrence between control and impact areas during the reference period. In case of Northern gannet, Sandwich tern, Common guillemot and Razorbill at the Thorntonbank, as well as for Northern gannet, Black-legged kittiwake and Common guillemot at the Bligh Bank, the delineated control area held highly similar densities compared to the impact area. This of course makes a good base for future BACI-comparison. Moreover, this modelling process is the first crucial step towards a power analysis, which will give insight in the probability of being able to statistically detect specified changes in bird numbers. In 2008, the first six turbines were installed at the Thorntonbank wind farm site. As expected, we were not yet able to discern any displacement effects. However, there are still about two hundred turbines to be installed at the Thorntonbank (C-Power), Bligh Bank (Belwind) and Bank Zonder Naam (Eldepasco), and as such it is too soon to draw any conclusions.

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs